Beşiktaş Group has made its workshop of 7 200 m2 closed area by our organisation in 2007 and the workshop has been able to make pre production for ship building. On the other hand, CNC watery cutting counter has been designed and put into service. As of 2008 dying, pipeing, electric and furnishing workshops of Beşiktaş Group have been completed.
1630 tons steel production and assembling have been realized in the scope of this Project.
|